Skip to main content

We wish you and your family a safe and enjoyable holiday, a Merry Christmas and a Happy New Year!

We will be closed for the holiday period from 1.00pm, Tuesday 23rd December 2025 and will reopen Monday 12th January 2026.

Lifestyle Property Development Broomfields Road

Whitford

What was involved?

A large dwelling with tennis court, swimming pool, standalone office building. Services rendered included Survey, Design, Consenting, Construction Monitoring and Project Management. Project works included regional and district plan consents for earthworks, stormwater and wastewater drainage. Specific requirements for detailed design for stormwater mitigation including grass swales, rain gardens and buried detention tank (modular cells). This included both primary and tertiary treatment of wastewater to the highest possible standards and use of a rotational dosed land irrigation disposal system. Structural design, calculations, construction inspections and Producers Statements (PS4) for landscape features, retaining walls and hard surfaces.

Our Services